很多业主在进行武汉房屋装修的时候都会有疑问,为什么要进行防水装修,进行防水装修有哪些要点需要注意。今天,我就来帮助大家解决疑惑,详细的解读武汉防水装修,告诉大家防水装修的重要性,以及防水装修的要点。
武汉防水装修不容忽视:
新房装修必然要进行水电改造势必破坏原开发商做的防水层。为了加强防水设置保护财产安全避免邻里纠纷所以新房装修必须做防水。
从市场的主流防水材料来看, 防水卷材因其施工技术要求高,主要适用于屋面工程,不宜家庭小面积防 水施工;911聚氨酯 防 水 涂料因其散发挥发性毒气、要求施工基面干燥、面层跟瓷砖不粘结等缺陷而难被家庭所接受;而JS 水泥基 防 水 涂料是由有机高分子液料和无机粉料复合而成,融合了有机材料弹性高和无机材料耐久性的优点,涂覆后形成高强坚韧的 防 水 涂膜,有着良好的 防 水 性能、高度耐老化和抗龟裂等优势,是绿色环保且施工方便,因此逐步成为家庭 的理想选择。
defenses have long been no longer a fresh topic, regardless of tunnels, bridges, roads, buildings or the houses we live in daily, defense against water is not to be neglected.
武汉 defense against water construction points:
一、 layering tiles must do floor waterproofing
If you need to replace the original floor tiles in the bathroom, after removing the original floor tiles, you must first use cement and sand to level the floor and then do waterproof treatment. This way you can avoid leaks caused by uneven thickness of waterproof coatings. Before doing waterproofing work, make sure to clean the floor thoroughly and apply epoxy-based waterproof coating repeatedly 2-3 times.
二、 try not to damage existing waterproof layers
In newly delivered housing units, bathrooms and kitchens already have a protective barrier made according to relevant standards on floors. So generally there will be no leakage problems during living. However nowadays common issues are that during renovation more facilities are added in bathrooms or pipes are re-routed or moved which inherently severely damages building's original protective barrier but without fixing or redoing waterproof work until leaks occur later on.
三、 keel grooves for pipes inside walls also require protection
During construction process when pipes pass through floors or drains penetrate into concrete slabs their holes must be carefully done around them. Wall-mounted water pipes should be laid out reasonably with all pipe holes larger than pipe diameters excavated as rounded slots covered with smooth mortar afterward applying epoxy-based sealant into these grooves.
四、 acceptable test results within 24 hours for validation of water resistance
After completing defensive works seal off doors and outlets below drainpipes fill up sanitary ware areas with enough water reaching a certain liquid height mark it down let it stay for 24 hours if there's no significant drop in liquid level especially without any signs of seepage from ceilings below then such defense has passed inspection otherwise redo entire project before re-testing.